City Cadre Academy (Phase 3 - Dormitory and hall)

Short Name -
Place 324 Chu Van An, Ward 12, Binh Thanh, Ho Chi Minh
Investor HCM City Academy of Officials
Scope of work General contractor
Type of construction Commercial
Scale Dormitory:
- Building height: 01 block of 7 floors and 02 blocks of 9 floors, sharing the same basement and basement floor 1+ ladder roof
- Construction floor area: 32,674 m2
Time to start 01/2020
Completion time 04/2021
Contract value (vnd) 205,980,000,000
Highlights 1. 3 blocks of dormitories with area of 32,600 m2
2. Accommodations for thousands of students from the HCM City cadre academy